Planned specifications:
Chamber: Same configuration as the original, SS ~5.3 in<sup>3</sup>
Barrel: SS 3' long .364" diameter, with attachment designed for larger future barrels
Valve: .5" QDV
Fueling: Chamber fueling
Ignition: Piezo from handheld lighter
Mixes: 5X-20X
4/12/2011: Parts arrived, fueling setup assembled

4/13/2011: Spark plug curing, along with experimentation for valve construction:
