
Here is the product of about 15 minuets of pvc work.... and about 1hr of lexan work,
SPECS:
Full hole lexan vortex block
6mm aluminum barrel, 12 in long... i think? ( i need a longer one.)
pvc chamber soon to be upgraded to c02 system.
Total cost, under 10 bucks... i had to buy the barrel, as well as a single pvc fitting.
PIC:

VIDEO:
60 psi unregulated test shots
[youtube][/youtube]
EDIT: fixed spelling errors....
Side note: I officially own my own house now!!! Bring on the boom!