
I felt the need to show you all this photo:
The 2'' valve is in progress! The weld for the 2'' nipple to the chamber is on Monday.
The valve seat/barrel port, is held in by epoxy (my new best friend) I poured the epoxy into the gap between the Hose barb, and the T, a good 1'' of epoxy is filling the small space between the barb and the T. Hope it holds.


The piston is also done, it is made from HDPE and has a grove for an O-ring.